Product Details:
Payment & Shipping Terms:
|
Steel Pipe: | Q345B High Strength Steel | Rated Load: | 5000kg |
---|---|---|---|
Rated Speed: | 0-30m/min | Max. Installation Hight: | 250m |
Max. Passenger No.: | 30 | Treatment: | Hot Dip Galvanization+Painting |
Wall Panel: | Punched Aluminium Panel | ||
Highlight: | 30m/min building site hoist,SCE500 building site hoist,30 passenger hoist lift |
5000kgs /SCE500 Twin Mast Building Hoist/material hoist with big cage for Construction Materials Transportation
SCE500 Twin Mast Building Hoist Technical features:
1. Widely used in warehouse, vehicle deliver and other construction projects;
2. Twin mast design to make sure the cage running smoothly and safety;
3. Large area loading cage, heavy duty loading capacity can meet the customers basic loading requitements.
4. Special safety device braking system. With TW high efficient motors and reducers.
5. Steel structure design with scientific and rigorous calculation, meet the requirements of reasonable structure, reliable strength, light weight.
SCE500 Twin Mast Building Hoist Specifications:
Model | SCE500 |
Loading capacity | 5000KG |
Rated speed | 0-30m/min |
Motor & Gear Box | 2x3x11kw Bevel Heicial Gearbox |
Inverter | 2x37kw Schneider |
Mast section size | 650*650*1508mm |
Cage size | 5*6*2.3m (can be customized) |
Safety device | SAJ70-1.4 (with braking system) |
Hot galvanize parts | Mast section/trolley |
Counterweight | Yes |
Competitive Points of SCE500 Twin Mast Building Hoist :
1. Production facility in hoist manufacturing industry. Such as Automatic laser cutting machine, fully automatic welding robot, automatic hydraulic bending & pressing machine etc.
2. Fully hot galvanized parts: It is not only hot galvanized mast sections, we also offer fully steel structure hot galvanized, such as the cage, tie-in, cable trolley, ground enclosure etc. It will long the working time for the whole steel structure, and also can make sure the steel structure in safety working condition.
3. Advanced technology on safety control: we have running condition monitor for Inverter, and also have the fault warning display. Customer can offer us the fault number which shows on the screen, we can make a primary diagnosis for the problem, it will greatly save inspection time and human cost.
SCE500 Twin Mast Building Hoist FAQ:
Q1: What about the lead time?
A: 30-50 days for production arrangement. Also we have some common models for stocks.
Q2: Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production.
Q3: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%. Secondly, during the guarantee period, we will take charge of replace the fault spare parts with new order .Or we can ask for our overseas sales agent to the working site and help customer to fix the building hoist.
SCE500 Twin Mast Building Hoist Case Show:
Contact Person: Zhang Chen
Tel: 0086-13810865644